Skip to main content

PLASTIC INJECTION MANUFACTURING

ERP for
Plastic Injection

Connect planning, materials, scrap and costing requirements with an Epicor ERP design suited to your factory.

Illustrative injection molding equipment
Illustrative master image; not an actual project or team photograph

INDUSTRY OVERVIEW

Plastic Injection
Industry Overview

Start by mapping your products, machines, molds and production records. Review how your factory receives and consumes materials, records scrap and delivers finished goods so each stage has a clear information handoff.

Illustrative plastic components

KEY CHALLENGES

Key questions for your injection molding operation

Production planning
& machine capacity

Review job priorities, actual run time, machine capacity and mold availability.

Material control
& scrap

Reconcile material issues, good output and scrap using consistent units.

Mold management
& changeovers

Identify mold records and setup time that affect the production plan.

Production cost
& decision data

Define the source of material, labor and manufacturing overhead costs.

HOW EPICOR SUPPORTS THIS INDUSTRY

Connecting your processes with ERP design

  1. 01

    Demand & Sales

    Connect demand to planning

  2. 02

    MRP & Planning

    Review materials and capacity

  3. 03

    Production Control

    Design production reporting

  4. 04

    Inventory & Traceability

    Define inventory tracking needs

  5. 05

    Cost Visibility

    Connect records for cost analysis

Epicor describes scheduling, materials and costing capabilities for Rubber & Plastics. Advanced MES and tooling requirements need a separate product, module and scope review. Epicor: Rubber & Plastics ↗

MANUFACTURING PROCESS

Illustrative injection molding process

  1. Raw Material
    1. Raw MaterialReceive and issue material
  2. Mold Setup
    2. Mold SetupPrepare molds and equipment
  3. Injection
    3. InjectionRecord output and scrap
  4. Quality Check
    4. Quality CheckCheck your quality requirements
  5. Warehouse / Delivery
    5. Warehouse / DeliveryStore and deliver

A discussion framework; confirm each factory’s actual process and control points.

DISCUSSION QUESTIONS

Questions to start the discussion

What information should we prepare?

Gather item and material lists, mold records, production steps, standard times and examples of receipt, issue and production records. Review completeness with the project team.

What should a scrap review cover?

Agree where scrap is recorded, the units, reasons and responsible roles before configuring the system. Results depend on the operating process as well as the software.

Are mold tracking and MES included?

Review requirements, product edition and modules separately; these are not assumed to be included in every ERP project.

Draft content pending review before publication

Discuss your injection molding requirements

Explore implementation services or begin preparing with our team

Discuss your ERP project

Search this page